blob: cc8a57b09586450276f57fa2512a34e3e033821e [file] [edit]
name: vm
concurrency:
group: ${{ github.workflow }}-${{ github.ref }}
# Cancel stale PR runs without interrupting push, tag, scheduled, or
# manually dispatched validation.
cancel-in-progress: ${{ github.event_name == 'pull_request' }}
permissions:
contents: read
on:
workflow_dispatch:
push:
branches:
- 'master'
- '[0-9]+.[0-9]+'
- '[0-9]+.x'
pull_request:
jobs:
validate-dco:
permissions:
pull-requests: read
uses: ./.github/workflows/.dco.yml
vm:
needs:
- validate-dco
uses: ./.github/workflows/.vm.yml
strategy:
fail-fast: false
matrix:
include:
# EL 8 is used for running the tests with cgroup v1.
# Do not upgrade this to EL 9 until formally deprecating the cgroup v1 support.
- template: template:almalinux-8
# openSUSE Tumbleweed is a rolling release, and provides coverage for
# a recent kernel and SELinux in enforcing mode
- template: template:experimental/opensuse-tumbleweed
with:
template: ${{ matrix.template }}
# To minimize CI time the whole test suite takes, focus on a subset of
# integration packages that currently contain cgroup-v1/v2 specific
# coverage (cgroup namespaces, cgroup driver/systemd, and resource
# update verification via /sys/fs/cgroup paths) and networking.
integration_dir: ./integration/container ./integration/build ./integration/system ./integration/network ./integration/networking